Monday, March 2, 2020

Paket Lengkap Pengukuran Kinerja Mesin Perusahaan Memakai Overall Equipment Effectiveness Dan Anjuran Perbaikan Memakai Diagram Alasannya Ialah Akhir (Fish-Bone) Pada Cv. Jati Makmur Pasuruan


ABSTRACT: This study aims to to know costs inflicted of a system of preventive maintenance and maintenance of the breakdown and its effect on downtime. The research was done in the lumber CV .Jati prosper with the qualitative study approach uses the descriptive.  Procedures data collection in penellitian it has several stages of, namely the preliminary survey, theoretical survey, and field study. The result from research found that among januari until december 2010 OEE range 65,093% -81,175%. After research found that two factors majority affect OEE value in CV.Jati Makmur two factors is reduce speed losses and setup and adjustment losses with proportion 45,83% and 40,88%.
Keyword: OEE (Overall Equipment Effectiveness), total productive maintenance, manufacturing performance
Penlis: Fredo Karismawan, Puspandam Katias
Kode Jurnal: jpmanajemendd151547

No comments:

Post a Comment